Conection of Enllaç Bufona – C9 (Escuain)

02

On August 1  interclub teams  (SAR, CEC ERE, ECGràcia, Proteus) in the annual expeditions of GEBadalona Escuaín has dived to the terminal siphon Linda C20 (-501m) getting the connection the C9 (-830M).

Finally on Saturday 31 July, a team of five people  went to Linda at 19pm to sleep in the bivouac, Sunday at 9 am a first team composed of Javier Garrido (ERE CEC) and Daniel Ferrer (ERE CEC) to finish ahead of equipping the recent wells siphon collector until two hours later three divers: Hilary Moreno (ERE / Proteus), Xavi German (ECG / Proteus) and Josep Guarro (EIS / Proteus) is also directed toward the siphon with diving gear.

Arrived to siphon de-Hilari 501m Moreno is responsible for it and dived, after 20 minutes returned with good news, connection with the C9-800m just a bit before the bivouac located in a small side gallery, where fossil footprints and bivouac gear were found.
original at espelobloc

Post a Comment

Your email is never published nor shared. Required fields are marked *

*
*
Copyright © 2007 CaverInfo. All rights reserved.